Hightower Construction is proud to announce the completion of St. John the Baptist. This project consisted of two phases: complete exterior brownstone restoration and the construction of a new steeple. The project was a success. Hightower would like to thank Glenn Keyes Architects, the Catholic Diocese of South Carolina, Lepore & Sons Masonry and Copper Exclusive. Through our team mentality and can-do attitude, we came together to produce a historical element of Charleston.
Hightower is especially proud of this accomplishment because the new steeple was built in-house at our production facility outside of Charleston. Excluding the copper cladding and steel frame fabrication, all construction and assembly was completed by our own Hightower crew.
For more detailed photos and information, visit our Projects>Restoration Gallery or check out www.charlestoncathedralrestoration.com.


